Seatrade Maritime is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Panama Canal says progress being made in talks with GUPC

Panama Canal says progress being made in talks with GUPC
The Panama Canal Authority (ACP) says progress is being made on negotiations with expansions contractor Grupo Unidos por el Canal (GUPC) over $1.6bn in cost overruns, with an accord expected to be signed by 18 February.

Appearing before Panama’s National Assembly on Tuesday, ACP administrator Jorge Quijano said that progress had been made in the negotiations GUPC and both parties have agreed upon 14 of the 15 points in discussion to resolve the crisis of the third set of locks construction which is paralyzed since 5 February.

However, that does not mean “we have been successful until we reach a full agreement in a document that we both sign,” he said.

The ACP expects to sign an accord before 18 February “Otherwise we would have to make a hostile move,” said Quijano in reference to the possibility of terminating the contract, which obviously is not the best option as it could represent years of litigations and delays.

Meanwhile, the ACP continues to consider alternatives such as Plan B which would see it take over the works and continue with the sub-contractors. “We are not afraid of doing it,” said Quijano, who added that the probable date for concluding the expansion is now December 2015.

Quijano has also asked GUPC to get all the gates in Panama by December this year. Four gates have been already delivered, four are waiting to be transported to Panama and four more are being assembled in Cimolai, Italy, of a total of 16 gates.