Seatrade Maritime is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

NITC needs large LNG fleet, says Souri

NITC needs large LNG fleet, says Souri

Dubai: Mohammad Souri, chairman of NITC (National Iranian Tanker Company) has told ltold media that the independent tanker company will need a substantial LNG fleet to handle projected gas production in Iran, half of which is expected to be carried on domestic hulls, reports Tehran Times. ''Given the plan on production of more than 80m tons of LNG annually, we have to build at least 40 vessels to carry 50 percent of the product," he said

"Concurrent with the signing of the contract on gas production, LNG plant, and export docks, the contract on the building of LNG carriers should be inked and the issue demands the finalization of LNG contracts,'' he concluded, adding that Iran expects to ship its first instalment of the gas in 2011.  [16/10/07]