Sponsored By

Panama’s Evergreen Colon Container Terminal inaugurates expansionPanama’s Evergreen Colon Container Terminal inaugurates expansion

Evergreen Group’s Colon Container Terminal (CCT) located on the Atlantic side of the Panama Canal held a ceremony to mark the completion of its newly built berth number 4 that will increase the terminal capacity to 2.4m teu, up from the present 1.5m teu.

Michele Labrut, Americas Correspondent

December 17, 2015

2 Min Read
Kalyakan - stock.adobe.com

Panama's President Juan Carlos Varela and the Minister of Maritime Affairs and Administrator of the Panama Maritime Authority (AMP) Jorge Barakat joined CCT Chairman Captain Yen-I Chang for ribbon cutting.

CCT registered the highest growth amongst Panamanian terminals for January-October 2015, with an increase of 20.8% to 666,846 teu, from 424,442 teu in 2014. “I can foresee cargo volume picking up this year since we saw the return of Evergreen service NUE 3 and MELFI calling CCT since May while Cosco has increased their feeder services,” said Chang. Panamanian ports moved 5.82m teu from January to October 2015, an increase of 3.4% over the year before.

“The canal expansion brings great expectations for the region. At CCT we have been investing continuously since the terminal opened in 1996, and we are ready to provide a highly efficient service to global trade,” said Chang. Evergreen CCT has invested a total of $700m in the terminal to-date.

President Varela told the audience, amongst which assisted various officials from the Evergreen Group, that [his] government will support CCT’s vision of the future and would take [the necessary steps] to “walk with you along your development.” CCT’s investment is a clear signal of its confidence in Panama and the province where it is located, praised Varela.

Phase Three of CCT expansion, built by China harbour Engineering Company (CHEC), brings 320 metres of additional quay and a 8.5-hectare-container yard. Three new STS 22-row- across cranes arrived in November and another STS 24-row-across crane is expected next year.

Dredging has increased draught to 16.5 metres giving capability to the terminal of handling simultaneously two large vessels of 12,000-14,000 teu. Besides, CCT is continuing with the next stage of its expansion programme to further increase quay length of berth 3 and berth 4 to 780 metres.

About the Author

Michele Labrut

Americas Correspondent

Michèle Labrut is a long-time Panama resident, a journalist and correspondent, and has continuously covered the maritime sector of Central & Latin America.

Michèle first came to Panama as a press attaché to the French Embassy and then returned to the isthmus as a foreign correspondent in the 1980s.

Author of Seatrade Maritime's annual Panama Maritime Review magazine and of several books, Michèle also wrote for Time magazine, The Miami Herald, NBC News and the Economist Intelligence Unit. She has also collaborated in making several documentaries for the BBC and European and U.S. television networks.

Michèle's profession necessitates a profound knowledge of the country, but her acumen is not from necessity alone, but a genuine passion for Panama.

In 2012 she was awarded the Order of Merit (Knight grade) by the French Government for her services to international journalism and in 2021 the upgrade to Chevalier grade.

Get the latest maritime news, analysis and more delivered to your inbox
Join 12,000+ members of the maritime community

You May Also Like