Sponsored By

Scramble for FSRUs as LNG takes centre stage

Seven more floating storage regasification units (FSRUs) are likely to be deployed in north-west Europe by the end of next year taking the total to 11 units.

Gary Howard, Middle East correspondent

October 24, 2022

2 Min Read
EemsEnergyTerminal
Eems Energy Terminal

FSRUs that were either inactive or trading as LNG carriers have been fixed on rates that are believed to have doubled in recent weeks, according to Clarkson Research. The scramble for units comes as LNG takes a central role in meeting European energy shortages. Russian LNG via pipeline has been replaced by imports from a range of suppliers by sea. Exports from the US, in particular, have risen sharply this year – the country is now the world’s largest LNG exporter.

FSRUs are the quickest and cheapest means of ramping up urgently needed import capacity. By the end of next year, Clarkson have revealed, the world FSRU fleet will total 53 units comprising newbuildings and conversions. By then, only one FSRU is likely to be inactive, although this could well be snapped up long before then. Scope to build new FSRUs is limited because new production capacity in countries including Qatar, Australia and the US, has led to a record 141 new LNG carrier contracts so far this year, Clarkson figures show.

The world’s seven specialist LNG builders are practically full until 2027 and there is little scope for additional building capacity between now and then. Other shipbuilders lack the resources necessary for LNG carrier construction and, in any case, have plenty of other work in hand.

Related:Ningbo-Zhoushan port opens more yards after covid outbreak

Likely additional demand for FSRUs in the short term, therefore, is likely to be met by conversions of older LNG carriers. According to experts, more than half of the existing LNG fleet is likely to fare badly in carbon intensity indicator (CII) assessments. There are more than 240 LNG carriers powered by energy-hungry steam turbines and a significant number of older vessels that do not have boil-off management systems and therefore cannot use LNG as fuel. Many of these ships will fall into CII categories, D and E, the experts predict.

About the Author

Gary Howard

Middle East correspondent

Gary Howard is the Middle East Correspondent for Seatrade Maritime News and has written for Seatrade Cruise, Seatrade Maritime Review and was News Editor at Lloyd’s List. Gary’s maritime career started after catching the shipping bug during a research assignment for the offshore industry. Working out of Seatrade's head office in the UK, he also produces and contributes to conference programmes for Seatrade events including CMA Shipping, Seatrade Maritime Logistics Middle East and Marintec. 

Gary’s favourite topics within the maritime industry are decarbonisation and wind-assisted propulsion; he particularly enjoys reporting from industry events.

Conferences & Webinars

Gary Howard regularly moderates at international maritime events. Below you’ll find a list of selected past conferences and webinars.

Get the latest maritime news, analysis and more delivered to your inbox
Join 12,000+ members of the maritime community

You May Also Like