The reduction will apply to vessels transiting the canal from 1 March 2022.
Vessels arriving with draughts greater than 15.09 m (49.5 ft) TFW will be allowed to transit after 1 March 2022, depending on the actual level of Gatun Lake at the time of transit. Otherwise, they will be required to trim or otherwise discharge cargo to be allowed to transit.
Draught reductions will be announced in 15.24 cm (6-inch) decrements, generally with at least four weeks' notice.
The ACP will continue to monitor the level of Gatun Lake to announce future draught adjustments in a timely manner.
Copyright © 2024. All rights reserved. Seatrade, a trading name of Informa Markets (UK) Limited.
Add Seatrade Maritime News to your Google News feed.    |
Â