Seatrade Maritime is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Testing times for Lankhorst tug bollard pull rope

Testing times for Lankhorst tug bollard pull rope

Rosetti Marino, a turnkey builder of oil platforms and service vessels for the offshore sector, has chosen a Lankhorst LankoForce rope for bollard pull testing for its new platform supply vessels (PSV) and anchor handling tugs. The rope was used recently to test the company's most powerful tug-to-date with a bollard pull of 220 metric tonnes.

Based in Ravenna, Italy, Rosetti Marino specialises in PSVs designed to provide assistance to offshore oil platforms and safely transport equipment and material to and from the platforms - even those located in very rough waters, such as the Baltic Sea and the North Sea. and particularly in adverse weather conditions.

Since 2010, bollard pull testing has become standard practice for newly built steel tugs. The test provides a good measure of the tugboat's maximum pulling load. Contacted to supply a bollard pull test rope at short notice, Lankhorst supplied a 88mm diameter, 300m LankoForce rope made from high modulus polyethylene (HMPE) Dyneema. The rope has an actual breaking load of 4806kN (490 mT) (spliced).

"Lankhorst was able to supply the new rope within 2.5 weeks ensuring we were able to meet our scheduled bollard test date," said Luca Mazzotti, Procurement and Subcontracting Dept, Rosetti Marino. "The increasing power of today's tugs makes bollard pull testing vital. In this case the LankoForce rope was needed to test a multifunctional anchor handling, tug, supply and service vessel with a bollard pull of 220t, the most powerful vessel we have built in this class."