It is the 10th in the series of chemical tankers booked by Furetank.
The vessel will have dual-fuel power system and run-on LNG/LBG (Liquified Bio-Gas), and feature reducing fuel and energy consumption to achieve lower emissions of CO2, sulphur oxide, nitrogen oxide and hazardous particles.
Furetank is a long-term client of Jinling Shipyard, which has placed the first batch of four chemical tankers in 2015. The latest number nine dual-fuel chemical tanker inked in January this year is scheduled to be delivered in 2024.